WYMA Pneumatic Tools 

1529690236@qq.com

WYMA  > 

AI - Page Sitemap

 > 

WYMA lifetime impact tool promotion for woodworking

WYMA lifetime impact tool promotion for woodworking

WYMA lifetime impact tool promotion for woodworking

Maximum torque
2800N.M
No load speed
4500RPM
Drive head size
1
Drive head length
8'',3''
Intake pipe diameter
13MM
Inlet pressure
10-13KG/CM2
Weight
13.4KG
Price
Get Latest Price
Get the latest price
Quantity Needed:
Pieces
E-mail:
Enterprise Strength
  • WYMA Pneumatic Tools runs an excellent, complete and effective sales and technical system. We strive to provide efficient services covering from pre-sales, in-sales, and after-sales, so as to meet customers' needs.
Product Details
To better learn about Pneumatic Tools, WYMA Pneumatic Tools will provide detailed pictures and detailed information in the following section for your reference.Pneumatic Tools, manufactured based on high-quality materials and advanced technology, has reasonable structure, excellent performance, stable quality, and long-lasting durability. It is a reliable product which is widely recognized in the market.
Company Advantages
1. Foshan Nanhai Haiyirong Pneumatic Tools Co., Ltd. is not only a pioneer in technology, but also forgoer in developing new impact tool .
2. impact tool features pneumatic tools that dramatically capture the eyes of users.
3. Whatever products our impact tool is used in, it works well.
4. This product looks good and feels even better. When people wearing this product, it will not cause itching, irritation, stiffness, or clinging.


WYMA lifetime impact tool promotion for woodworking-1
WYMA lifetime impact tool promotion for woodworking-2
WYMA lifetime impact tool promotion for woodworking-3


/  Product Description
WYMA pneumatic tools are diversified and complete in variety, including: pneumatic screwdrivers, pneumatic wrenches, wind guns, pneumatic die grinders, pneumatic engraved pens, pneumatic sandpaper machines, spray guns, pneumatic nail guns and pneumatic rivet guns, etc. product.


The single hammer has no pin impact structure
WYMA lifetime impact tool promotion for woodworking-4
Large output torque
WYMA lifetime impact tool promotion for woodworking-5
Light weight
WYMA lifetime impact tool promotion for woodworking-6
Long service life
WYMA lifetime impact tool promotion for woodworking-7


Application
It is suitable for large-scale vehicle tire replacement, large-scale mechanical disassembly, large-scale power plants and shipbuilding and other large projects.


WYMA lifetime impact tool promotion for woodworking-8
WYMA lifetime impact tool promotion for woodworking-9
WYMA lifetime impact tool promotion for woodworking-10



/  Brand strength


Company Profile

Professional brand is trustworthy

WYMA lifetime impact tool promotion for woodworking-11
COMPANY PROFILE

Foshan Nanhai Haiyirong Pneumatic Tools Co., Ltd. specializes in pneumatic tools for 15 years, mainly based on “WYMA”  pneumatic tools.
WYMA pneumatic tools have a strong technical team, from technical advice to Product mold development, design and application, the selection of accessories, all from the sex Price to configure from the highest angle, provide one-stop service, lifelong dimension Protection. We have 15 years of practical experience, providing quality and perfect After-sales service has been praised and selected by many buyers!

WYMA lifetime impact tool promotion for woodworking-12
INSIDE THE FACTORY

WYMA pneumatic tools teamed up with over 1000 dealers, selling network radiation All over the country and Southeast Asia.
Factory main products: pneumatic screwdriver, toggle wrench, wind gun, pneumatic grinding Machines, pneumatic mills, spray guns, nail guns and pneumatic rivet guns.

WYMA lifetime impact tool promotion for woodworking-13
Technical team
WYMA lifetime impact tool promotion for woodworking-14
Customer service team
WYMA lifetime impact tool promotion for woodworking-15
Maintenance team


In stock Full day delivery

Strength business storage warehouse, inventory is full, welcome to join procurement

WYMA lifetime impact tool promotion for woodworking-16


▶ The workers are busy with the stocking and delivery, and the online and offline dealers all unify the same day delivery.


WYMA lifetime impact tool promotion for woodworking-17
WYMA lifetime impact tool promotion for woodworking-18
▶ A corner of the shelf
WYMA lifetime impact tool promotion for woodworking-19
▶ Corner of the warehouse
WYMA lifetime impact tool promotion for woodworking-20
▶ Factory Windmill Exhibition Hall
WYMA lifetime impact tool promotion for woodworking-21
▶ Factory material reserve


Qualification certificate

Professional brand Trustworthy

WYMA lifetime impact tool promotion for woodworking-22



/  Product customization
We have a strong technical team, from technical consultation to product mold development, design and application, the selection of accessories, from the most cost-effective point of view to provide one-stop service, lifetime maintenance.


How to customize privately?


WYMA lifetime impact tool promotion for woodworking-23
Communicate with wyma
WYMA lifetime impact tool promotion for woodworking-24
Feasible plan confirmation
WYMA lifetime impact tool promotion for woodworking-25
Customized payment
WYMA lifetime impact tool promotion for woodworking-26
Customized product production
WYMA lifetime impact tool promotion for woodworking-27
Customized product collection


WYMA pneumatic tools custom instructions

❈ The customized machine is a special product, it is not suitable for no reason to return the goods, and the custom process is entered immediately after the payment is made. The non-product quality problem cannot be returned or exchanged;


❈ Customized products, according to the complexity of the process and the production schedule to give a reasonable delivery date, we deliver within the agreed time, if encountering uncontrollable conditions, will delay delivery and notify the customer;


❈ Customized products, if not specified, apply to our wyma series product warranty regulations.




/  Pneumatic tool instructions
Oil (the pneumatic tools are in the best condition, please be sure to implement them daily)
(1) Please apply oil 3-5 times a day: the oil supply method is to inject 2-3 drops from the air inlet, let the tool idle for 3-5 seconds.
(2) Oil varieties: Please use #15 pneumatic tool oil
(3) In addition to the above-mentioned oil supply, the impact wrench is applied to the striker approximately once a month, and is oiled in the following manner:
● After removing the parts of the striking part, wipe off the old grease
● Apply a new amount of grease to the right amount (about 10-15 cc). If too much grease is added, the torque will be deteriorated.
Compressed air
● Clean and dry compressed air is necessary. Please remove the oil, water and quality in the air compressor and accessories. Please use a three-point combination (oil-water separator, pressure regulator, oiler).
● Please use according to the specific pressure requirements of each model. If excessive air pressure is used, the service life will be shortened and the cause of the malfunction will be caused.
Management on use
(1) Pneumatic tools are very sophisticated tools, do not bump or drop
(2) Do not run for long periods of time
Do not overload, to avoid danger



Company Features
1. Foshan Nanhai Haiyirong Pneumatic Tools Co., Ltd. is a professional manufacturer with world-class products.
2. We are proud to own many innovative engineers and elites. They aim at the core value of innovation and lean production, which enables them to offer creative and dependable products for customers from worldwide.
3. We have a clear and targeted aim for our company's future. We will work shoulder-to-shoulder with our clients and help them thrive on change. We will grow stronger through the challenges. Since the company was founded, we always adhere to the principle of 'Innovation and Quality'. Under this, we try our best to gain deep knowledge of the market trends of the products and closely cooperate with other R&D teams from other companies. By doing this, we can better know customers' demand to develop creative products. We strive to build our teams on trust and respect, where every voice is heard and valued because we believe there is power in individuals but great power in teams. Call!
Product Message
Chat Online 编辑模式下无法使用
Chat Online inputting...
Online consulting